Cabinetry subcontractors

Cabinetry bids, ordering and delivery tracking for multifamily installers

For cabinet installers, the risk sits after the bid: hundreds of units, orders by floor, suppliers who miss dates and missing pieces found on site. Vorbi builds the project matrix from the plans, produces the bid, places orders by unit and floor, and tracks confirmations and deliveries so changes surface early.

Available. Built from the workflow a commercial cabinetry and trim subcontractor runs every day.

BASE RUN11 LF · sample
Takeoff

What Vorbi measures for cabinetry

  • Project matrix: buildings, floors, unit types and counts
  • Cabinet and countertop scope by unit type
  • Orders organised by unit and floor
  • Supplier confirmations and delivery dates tracked automatically from email
  • Missing-item tracking and alerts on any change
  • Installer progress, punch lists and change orders
Workflow

From drawings to installed

Send the drawings

Plans, elevations and specs for the bid.

Build the matrix

Unit types and counts by floor and building.

Price and send

Supplier pricing and your labor rates produce a polished bid document.

Order and chase

Orders by unit and floor; supplier emails update delivery dates.

Install and close out

Unit-by-unit tracking, punch lists and change orders.

Cabinetry takeoff

Quantities with the plan they came from

Each quantity is tied to a marked-up plan, so you can see what was measured and what was left out. Measure a unit type once and Vorbi totals it across floors and buildings.

The screen shows sample data for illustration.

Takeoff · Sheet A-201 · Unit A2Sample data
Bedroom: closets by others LIVING / KITCHEN BEDROOM 1 BEDROOM 2 BATH HALL SAMPLE PLAN · UNIT TYPE A2
Quantities
  • Base cabinets11LF
  • Wall cabinets9LF
  • Vanity, bath1EA
  • Pulls and knobs18EA
Unit type A2 × 24 unitsRolled up
Plan vs finish schedule: 1 question for the GC
Illustrative takeoff screen: a sample floor plan with measured areas highlighted and the resulting quantities listed beside it.
After the award

Orders, deliveries and installs on the same numbers

Won bids become orders by building, floor or unit. Supplier emails update delivery dates, and installers check off each unit from their phones with photos.

Orders and deliveriesSample data
Supplier email read · new delivery date filed to Bldg 2 · Floors 1–3
  • Bldg 1 · Floors 1–2Delivered
  • Bldg 1 · Floors 3–5Confirmed · Tue
  • Bldg 2 · Floors 1–3Date moved +4 days
  • Bldg 2 · Floors 4–5Awaiting supplier
Illustrative delivery tracker: material batches by building and floor with delivery status, and a supplier email that moved a delivery date.
9:41●●●
Installer app · SampleUnit 304Floor 3 · Bldg 1
3/5
  • Base installed, living
  • Base installed, bedrooms
  • Door casing, 3 openings
  • Photos uploaded
  • Ready for punch walk
Add photo
Illustrative installer phone app: a checklist for one unit with progress and a button to add photos.
Q&A

Cabinetry: quick answers

Does Vorbi place cabinet orders?

Vorbi organises material orders by unit and floor, generates the supplier orders and tracks confirmations and delivery dates. On done-for-you engagements our team places and chases the orders for you.

How are supplier delays caught?

Supplier emails are read and filed against the right order, delivery dates update in the system, and you are alerted when anything changes or goes missing.

Is cabinetry proven on Vorbi?

Yes. The cabinetry and trim workflow runs in production every day at a commercial cabinetry and trim subcontractor, and it is the foundation the other trade templates are built from.

See Vorbi on one of your cabinetry bids.

Tell us your trade and how you bid today. On a short discovery call we walk through your workflow and recommend the right way to work together.

Explore options for your company
  • Discovery call, no preparation needed
  • We map how you bid, buy and install
  • No obligation